Honest & reliable contractors · Since 2018

M-104 Commercial Services

Custom office fit-outs from permit drawings to move-in day

Private offices, boardrooms and open work areas built out in leased or owned space, with the drawings, permit, HVAC, sprinkler and glass work handled under one contract.

  • Permit drawings prepared in-house
  • One contract, design to build
  • Free estimates on every project

Free, no-obligation estimate. We typically reply within 24 hours.

A newly fitted-out office: glass boardroom, open workstations and acoustic baffles
An office fit-out under construction: steel stud partitions, drywall going up, ductwork overhead
A bright office reception area with a wood reception desk, glass doors and a seating area
Since 2018Honest & reliable contractors
In-house engineeringDrawings, letters & permits
The MKC GuaranteeOn time, within budget
162+ projectsAcross Toronto & the GTA

M-104.1 Why MKC

Why choose MKC for custom office fit-outs

An office fit-out touches more trades than most renovations: partitions, ceilings, HVAC zones, sprinkler heads, fire alarm devices, power, data and glass. MKC brings the drawings, the permit application and the mechanical work in-house, so every wall that moves is matched by changes to air supply and fire protection. You get one schedule and one contact, backed by our guarantee: on time, within budget, and beyond expectations.

Featured

One contractor, every trade

When a wall moves, the supply diffuser, return grille, sprinkler head and alarm device may have to move with it. Our drawings show all of them before construction starts, so those changes are reviewed with the permit instead of turning up at inspection.

M-104.2 Scope

What’s included

  • M-104.1Office fit-outsLeased and owned space, from demolition to finished floors.
  • M-104.2Boardrooms and private officesGlass or drywall partitions with acoustic insulation and door hardware.
  • M-104.3Open work areasLayouts for workstations, power, data and meeting zones.
  • M-104.4HVAC and sprinkler changesDiffusers, zones, sprinkler heads and alarm devices moved to suit new walls.
  • M-104.5Washrooms and kitchenettesPlumbing, finishes and barrier-free layouts where the Building Code requires them.
  • M-104.6Permits and drawingsFloor plans and permit application, plus drawings for landlord review.

M-104.3 Budget & schedule

What affects
the price

Every estimate is built from your measurements and choices. These are the things that move the number most.

Typical timeline

A small office refresh can take a few weeks, while a full-floor fit-out usually runs a few months. Permit review, landlord approvals and lead times for glass, doors and HVAC equipment are what decide the move-in date.

Every project is different, so your estimate comes with its own written schedule, and we aim to beat the usual industry timeline on every job.

  1. 01
    Size and layout

    The number of enclosed rooms, partition type and ceiling work drive most of the cost.

  2. 02
    Glass versus drywall

    Glass partitions cost more than drywall but share daylight. Acoustic glazing costs more again.

  3. 03
    Mechanical changes

    New HVAC zones, diffusers, sprinkler heads and alarm devices add trades and inspections.

  4. 04
    Washrooms and accessibility

    New or reworked washrooms, and any barrier-free upgrades the Building Code requires, add plumbing and floor space.

  5. 05
    Building rules

    Landlord requirements, after-hours work and elevator bookings in occupied buildings add labour and time.

G-003 How we work

How we deliver your office fit-out

  1. 1

    Free Estimate

    Tell us what you have in mind. We review your space and goals and give you a clear estimate at no cost.

  2. 2

    Planning + Permits

    We finalize design and scope. Our in-house engineering team prepares drawings, engineering letters and permit applications.

  3. 3

    Material Procurement

    We order equipment and materials early, confirm lead times and schedule deliveries around shutdowns and site access.

  4. 4

    Construction Process

    Our crews build to code with site supervision and regular updates, so you always know where things stand.

  5. 5

    Project Completion

    Final inspection, walkthrough and clean-up. On time, within budget and beyond expectations. That is the MKC Guarantee.

Plan your project
with a free estimate.

We review your space and goals and give you a clear estimate at no cost.

M-104.4 Questions

Questions about custom office fit-outs

Don’t see your question? Call (647) 637-6052 or ask in your estimate request.

Do we need a building permit for an office fit-out?

In most cases, yes. In Toronto, an interior alteration permit covers new partitions and finishes, and relocating sprinkler heads or fire alarm components is part of it. The application shows existing and proposed uses, plumbing fixtures and the building’s existing life safety systems. Once it is complete, the Ontario Building Code sets the review period, such as 20 business days for a large building. We prepare and file it.

Will our renovation trigger barrier-free upgrades?

It depends on the scope. The Ontario Building Code’s barrier-free requirements apply to most new construction and to extensive renovations, and existing buildings are not affected unless an extensive renovation is planned. Whether your fit-out counts as one depends on how much of the space is being rebuilt. Our engineers review your scope against the code before design starts, so you know the answer before permit review.

What makes one fit-out cost more than another of the same size?

Enclosed rooms cost more than open areas, glass partitions cost more than drywall, and every moved wall can mean new HVAC zones, sprinkler heads and alarm devices. Washrooms, kitchenettes and accessibility upgrades add plumbing. Building rules matter too, such as after-hours work, elevator bookings and landlord-approved trades. Our free estimate prices your actual layout, so you can compare options before you commit.

Can you build out our office while we keep working?

In most cases, yes, with phasing. We seal off the work area with dust partitions, protect the HVAC returns so dust does not travel, and schedule noisy work such as demolition and coring before or after business hours. Phases are planned so your staff always have working space, washrooms and a safe exit. You get regular updates from our site supervision as each phase closes.

What happens at the end of the project?

We book the final building inspections, balance the HVAC airflow to the new room layout, and walk the space with you to list anything that needs adjusting. Those items are fixed, the site is cleaned, and you receive copies of the permit documents and inspection records for your files. Then your team moves in.

G-009 Free estimate

Get a free estimate.
Claim up to $2,500 in savings.

Fill out the form to claim up to $2,500 in savings on your next project. Tell us what you’re planning and we’ll book a visit to see the space. Offer terms

  1. 1Tell us about the project (about a minute)
  2. 2We typically reply within 24 hours to book your visit
  3. 3We review your space and goals and give you a clear estimate at no cost
Head office135 Ormont Drive, Unit 11C, North York, ON M9L 1N6

What can we help you with?
(647) 637-6052Free estimate

Your project sheet

One estimate, one site visit and one contract for everything on this list.

    Typical order of work

      Get one estimate