Honest & reliable contractors · Since 2018

M-105 Commercial Services

Steel frame construction with the engineering done in-house

Structural steel frames, mezzanines, platforms and beams for commercial, industrial and residential projects, designed by our in-house engineers and built under the same contract.

  • In-house engineering department
  • Permit drawings prepared in-house
  • One contract, design to build

Free, no-obligation estimate. We typically reply within 24 hours.

A commercial steel building frame under construction: steel columns, bolted connection and open-web joists
A steel mezzanine inside a warehouse with a steel stair and a yellow guardrail
A steel beam installed across a wide opening in a house during a wall removal, on steel posts
Since 2018Honest & reliable contractors
In-house engineeringDrawings, letters & permits
The MKC GuaranteeOn time, within budget
162+ projectsAcross Toronto & the GTA

M-105.1 Why MKC

Why choose MKC for steel frame construction

Steel goes up fast, but only when the design, the shop drawings and the site are ready for it. MKC’s engineering department designs the members and connections, checks the existing structure and foundations, and prepares the permit drawings, and the people who build the frame work with those engineers. When a site condition does not match the drawings, the fix is settled inside one contract instead of through a chain of letters.

Featured

Engineered and built under one contract

Our engineers design members and connections, review the fabricator’s shop drawings and plan site visits during erection. Questions about a beam size or a bolt pattern go to the engineer who designed it, which keeps the schedule moving.

M-105.2 Scope

What’s included

  • M-105.1Structural steel buildingsFrames for commercial, industrial and warehouse buildings.
  • M-105.2Mezzanines and platformsStorage mezzanines, equipment platforms and stairs, designed for your loads.
  • M-105.3Beams and columnsSteel beams and posts for wall removals and open spans.
  • M-105.4Connection designBolted and welded connections designed and detailed in-house.
  • M-105.5Foundations and footingsNew footings and checks on existing slabs for column loads.
  • M-105.6Site reviewEngineer reviews during erection, where the Building Code calls for them.

M-105.3 Budget & schedule

What affects
the price

Every estimate is built from your measurements and choices. These are the things that move the number most.

Typical timeline

Once steel arrives, a mezzanine or beam installation is often a matter of days on site, while a new steel building takes months. Design, permit review and fabrication lead time usually take longer than the erection itself.

Every project is different, so your estimate comes with its own written schedule, and we aim to beat the usual industry timeline on every job.

  1. 01
    Tonnage and spans

    Longer spans and heavier loads mean deeper members and more steel by weight.

  2. 02
    Connections

    Welded and moment connections take more fabrication time than simple bolted ones.

  3. 03
    Foundations

    Column loads often need new footings or slab cuts, especially in existing buildings.

  4. 04
    Access and lifting

    Crane size, site access and working inside an occupied building affect erection cost.

  5. 05
    Coatings and fireproofing

    Primer, galvanizing or fire-resistive coatings, where required, add material and labour.

G-003 How we work

How we deliver your steel building

  1. 1

    Free Estimate

    Tell us what you have in mind. We review your space and goals and give you a clear estimate at no cost.

  2. 2

    Planning + Permits

    We finalize design and scope. Our in-house engineering team prepares drawings, engineering letters and permit applications.

  3. 3

    Material Procurement

    We order equipment and materials early, confirm lead times and schedule deliveries around shutdowns and site access.

  4. 4

    Construction Process

    Our crews build to code with site supervision and regular updates, so you always know where things stand.

  5. 5

    Project Completion

    Final inspection, walkthrough and clean-up. On time, within budget and beyond expectations. That is the MKC Guarantee.

Plan your project
with a free estimate.

We review your space and goals and give you a clear estimate at no cost.

M-105.4 Questions

Questions about steel frame construction

Don’t see your question? Call (647) 637-6052 or ask in your estimate request.

Is steel more expensive than wood or concrete?

It depends on the span and the load. For long clear spans, heavy loads and fast erection, steel often comes out ahead once labour and schedule are counted. For short spans in houses, engineered wood can be cheaper, and steel prices move with the market. Our engineers can compare the options for your layout before you commit, so the choice is based on your building rather than a rule of thumb.

Can you install a mezzanine while our warehouse keeps operating?

Usually, yes. We fence off the work area, schedule deliveries and crane lifts around your shipping hours, and set columns and beams before the deck goes on. The noisiest work, drilling anchors and cutting, can be planned for quieter shifts. We agree the phasing and the protected walkways with you before we mobilize, so forklifts and crews stay apart.

Does a new mezzanine need a building permit?

In most cases, yes. A mezzanine adds floor area and load, so the municipality reviews the structure, guards, exits and, in some buildings, fire protection. Ontario’s Building Code Act prohibits construction without a required permit and requires the work to follow the approved drawings. Our in-house engineering department prepares the structural drawings and the permit application.

Who checks that the steel is installed as designed?

Where the Ontario Building Code requires an architect’s or engineer’s design, it also requires their general review during construction, and the owner commits to it on a form at permit stage. On our projects, the plan is for our engineers to review shop drawings, visit the site at key stages such as anchor bolts and connections, and confirm the work matches the design, so problems are raised early.

Does structural steel need maintenance?

Interior steel in a dry building needs little beyond a periodic look for damage, such as forklift impacts on columns or racking. Exterior steel, steel near loading doors and steel in parking areas needs its coating inspected and touched up, because corrosion starts wherever paint or galvanizing is damaged. We inspect members and connections and repair damaged steel and coatings.

G-009 Free estimate

Get a free estimate.
Claim up to $2,500 in savings.

Fill out the form to claim up to $2,500 in savings on your next project. Tell us what you’re planning and we’ll book a visit to see the space. Offer terms

  1. 1Tell us about the project (about a minute)
  2. 2We typically reply within 24 hours to book your visit
  3. 3We review your space and goals and give you a clear estimate at no cost
Head office135 Ormont Drive, Unit 11C, North York, ON M9L 1N6

What can we help you with?
(647) 637-6052Free estimate

Your project sheet

One estimate, one site visit and one contract for everything on this list.

    Typical order of work

      Get one estimate