Commercial waterproofing for parking garages, decks and foundations

Traffic membranes for parking garages, waterproofing for plaza decks and green roofs, and leak repairs in foundation walls and elevator pits, all specified by our in-house engineers.

  • In-house engineering department
  • Free estimates on every project
  • Written schedule with each estimate

Free, no-obligation estimate. We typically reply within 24 hours.

Waterproofing a podium deck over an underground garage: hot-applied membrane, a drainage mat over insulation, and membrane flashed up a planter wall
Below-grade waterproofing on a commercial foundation wall: sheet membrane and drainage board beside the excavation shoring
A leaking crack in an underground parking garage wall being injected, with injection ports along the crack
Since 2018Honest & reliable contractors
In-house engineeringDrawings, letters & permits
The MKC GuaranteeOn time, within budget
162+ projectsAcross Toronto & the GTA

M-111.1 Why MKC

Why choose MKC for commercial waterproofing

A suspended garage slab is a roof that cars drive on, and all winter they carry road salt onto it. Salty water works into cracks and joints, and once chlorides reach the rebar, it rusts and the concrete cracks and spalls. Below grade, groundwater pushes into any open crack in a foundation wall or elevator pit. MKC’s engineers find where water gets in, choose the membrane or repair and prepare the drawings and permit applications. We phase the work so the building stays in use.

Featured

Tested before it is covered

Before a topping, pavers or soil cover a deck membrane, we test it: a flood test ponds water on it (ASTM D5957), or electronic leak detection traces current through any hole to the concrete. Any leak is fixed on bare membrane, not under a finished deck.

M-111.2 Scope

What’s included

  • M-111.1Garage traffic membranesTraffic coatings on suspended slabs, ramps, drive aisles and turns.
  • M-111.2Protected deck membranesHot rubberized asphalt under a topping that can also hold snow-melt tubing.
  • M-111.3Plaza decks and green roofsMembrane, root barrier, insulation and protection board under pavers, planters and soil.
  • M-111.4Expansion and control jointsFailed joint seals replaced so slabs can move without leaking.
  • M-111.5Foundation wallsExterior membranes, blindside membranes at the lot line, and interior crystalline coatings.
  • M-111.6Crack injection and elevator pitsPolyurethane for active leaks, epoxy where a crack needs a structural bond.

M-111.3 Budget & schedule

What affects
the price

Every estimate is built from your measurements and choices. These are the things that move the number most.

Typical timeline

Crack injection and pit repairs are usually short visits. Garage and deck membranes are phased zone by zone over weeks or months, since a typical polyurethane traffic coating takes several days per zone and membranes need dry weather.

Every project is different, so your estimate comes with its own written schedule, and we aim to beat the usual industry timeline on every job.

  1. 01
    Area and access

    The area, and whether we can reach the outside face or must work from inside.

  2. 02
    Membrane system

    Thin traffic coatings, hot rubberized asphalt with a topping and fast-curing methacrylates differ in cost, weight, cure time and service life.

  3. 03
    Removal and concrete repair

    Old toppings and membranes come off first, and the concrete repairs below are only fully known once exposed.

  4. 04
    Phasing and working hours

    Keeping part of a garage open, and noise and dust limits in an occupied building, add time and cost.

  5. 05
    Details and testing

    Joints, curbs, penetrations and transitions take more work than open deck, and flood tests or leak scans add time.

G-003 How we work

How we deliver your waterproofing project

  1. 1

    Free Estimate

    Tell us what you have in mind. We review your space and goals and give you a clear estimate at no cost.

  2. 2

    Planning + Permits

    We finalize design and scope. Our in-house engineering team prepares drawings, engineering letters and permit applications.

  3. 3

    Material Procurement

    We order the membrane system, joint seals and injection resins for your building, and schedule each phase around the weather, cure times and the building’s operations.

  4. 4

    Construction Process

    Our crews build to code with site supervision and regular updates, so you always know where things stand.

  5. 5

    Project Completion

    Final inspection, walkthrough and clean-up. On time, within budget and beyond expectations. That is the MKC Guarantee.

Plan your project
with a free estimate.

We review your space and goals and give you a clear estimate at no cost.

M-111.4 Questions

Questions about commercial waterproofing

Don’t see your question? Call (647) 637-6052 or ask in your estimate request.

Which waterproofing system suits our parking garage?

It depends on the slab, the traffic and how long each zone can close. Thin polyurethane traffic coatings, 1.5 to 3 mm thick, bond to the concrete and add little weight. Hot rubberized asphalt under an asphalt or concrete topping is thicker and heavier, but the topping shields it from wear and snowplows. Fast-curing methacrylates go down in hours at ramps and turns. For new garages, CSA S413 sets requirements for these systems. Our engineers check load and clearance before recommending one.

Can the garage stay in use while the work is done?

Usually, yes. We work in zones: one area is closed, prepared, coated and cured while cars use the rest, with traffic rerouted and notices posted before each move. In Toronto, clearly audible construction noise is allowed 7 a.m. to 7 p.m. on weekdays and 9 a.m. to 7 p.m. on Saturdays, but not on Sundays or statutory holidays without an exemption permit. We plan the zones, notices and noisy work with property management before we start.

How does waterproofing fit into our reserve fund study?

Ontario condominiums must update their reserve fund study at least every three years, and each study plans major repair and replacement over at least 30 years. Garage and deck membranes, joints and slab repairs are usually part of that plan, and the Condominium Authority of Ontario flags suspended slabs that support parking, driveways or landscaping as a risk to plan for. We price the work in phases, so your board can match it to the study’s funding plan.

Can leaks in a foundation wall or elevator pit be fixed from inside?

Often, yes. Cracks and joints that are leaking get polyurethane injection, and dry, dormant cracks that need a structural bond get epoxy. Walls and pit floors can then be coated with crystalline waterproofing. In an elevator pit, the elevator contractor shuts the car down and removes covers first. An outside membrane still works best because it keeps water out of the concrete, so we use one wherever we can, including blindside membranes fixed to the shoring before a lot-line wall is poured.

Do we need a building permit for waterproofing work?

It depends on the scope. Ontario’s Building Code Act counts material alteration or repair as construction, which needs a permit. Toronto lists basement waterproofing repairs and re-roofing without structural work as jobs that don’t, while structural or material alterations and new green roofs do. A like-for-like membrane may not need one; structural concrete repairs usually do. Your municipality makes the final call. When a permit is needed, our engineers prepare the drawings and application.

G-009 Free estimate

Get a free estimate.
Claim up to $2,500 in savings.

Fill out the form to claim up to $2,500 in savings on your next project. Tell us what you’re planning and we’ll book a visit to see the space. Offer terms

  1. 1Tell us about the project (about a minute)
  2. 2We typically reply within 24 hours to book your visit
  3. 3We review your space and goals and give you a clear estimate at no cost
Head office135 Ormont Drive, Unit 11C, North York, ON M9L 1N6

What can we help you with?
(647) 637-6052Free estimate

Your project sheet

One estimate, one site visit and one contract for everything on this list.

    Typical order of work

      Get one estimate