S-103 Engineering Services

Wastewater management from interceptors to on-site sewage systems

Grease and oil interceptors, backflow prevention, sewer connections, site drainage and on-site sewage systems, designed by our engineers to by-law requirements and installed under one contract.

  • In-house engineering department
  • One contract, design to build
  • Free estimates on every project

Free, no-obligation estimate. We typically reply within 24 hours.

A septic system installation: distribution pipes, clear stone bed and new septic tank
A backwater valve installed in a basement floor with its access cover open
A sump pump in a sump pit with a discharge pipe and check valve in a basement
Since 2018Honest & reliable contractors
In-house engineeringDrawings, letters & permits
The MKC GuaranteeOn time, within budget
162+ projectsAcross Toronto & the GTA

S-103.1 Why MKC

Why choose MKC for wastewater management

Wastewater problems usually surface as a backup, a fine or a failed inspection. Toronto’s Sewers By-law, for example, requires food service establishments to install and maintain grease interceptors, and premises where vehicles are repaired or serviced to have oil interceptors. MKC’s engineers design to the by-law and the Building Code, the installation is part of the same contract, and we help you set up the maintenance schedule the by-law expects.

Featured

Design, build and compliance

Engineering, excavation and installation sit in one contract, and you receive the drawings, test reports and maintenance schedule that an inspector or the City may ask to see.

S-103.2 Scope

What’s included

  • S-103.1Grease interceptorsSized and installed for restaurants, cafeterias and food counters.
  • S-103.2Oil and grit interceptorsFor repair shops, garages and sites where sand or grit can reach sewers.
  • S-103.3Backflow preventionPremise isolation devices, installed under permit, with annual test coordination.
  • S-103.4Sewer connectionsNew laterals, repairs, cleanouts and camera inspections.
  • S-103.5Site drainageCatch basins, trench drains and foundation drainage.
  • S-103.6On-site sewage systemsSeptic tank and leaching bed design under the Building Code.

S-103.3 Budget & schedule

What affects
the price

Every estimate is built from your measurements and choices. These are the things that move the number most.

Typical timeline

An indoor interceptor or backflow device can often be installed in a day or two, while sewer connections and on-site sewage systems take longer. Permits, what the excavation uncovers and the weather decide the rest.

Every project is different, so your estimate comes with its own written schedule, and we aim to beat the usual industry timeline on every job.

  1. 01
    Device type and size

    Interceptor and backflow device sizes follow flow rates, fixtures and the property’s hazard level.

  2. 02
    Location and access

    Indoor installs under slabs need cutting and restoration, and outdoor ones need excavation.

  3. 03
    Excavation depth

    Deep sewer connections and poor soil need shoring and more restoration.

  4. 04
    Permits and testing

    Most installations need a building permit, and backflow devices need a test report.

  5. 05
    Restoration

    Repaving, concrete and landscaping after excavation add to the final cost.

G-003 How we work

How we deliver your wastewater system

  1. 1

    Free Estimate

    Tell us what you have in mind. We review your space and goals and give you a clear estimate at no cost.

  2. 2

    Planning + Permits

    We finalize design and scope. Our in-house engineering team prepares drawings, engineering letters and permit applications.

  3. 3

    Material Procurement

    When the design leads to construction, materials and equipment are ordered from the approved drawings, so what arrives matches what was permitted.

  4. 4

    Construction Process

    Our crews build to code with site supervision and regular updates, so you always know where things stand.

  5. 5

    Project Completion

    Final inspection, walkthrough and clean-up. On time, within budget and beyond expectations. That is the MKC Guarantee.

Plan your project
with a free estimate.

We review your space and goals and give you a clear estimate at no cost.

S-103.4 Questions

Questions about wastewater management

Don’t see your question? Call (647) 637-6052 or ask in your estimate request.

How often does a grease interceptor need servicing in Toronto?

A grease trap must be emptied completely, cleaned and inspected every four weeks, or sooner if fats, oils, grease and solids reach 25 per cent of its liquid volume or its rated capacity. The City may allow up to eight weeks if your records show low build-up. Not having a working interceptor can lead to fines of up to $100,000. We install and size interceptors to keep servicing manageable.

Does our building need a backflow preventer, and how often is it tested?

In Toronto, industrial, commercial, institutional and larger residential properties must have a backflow prevention device on their water supply. Devices are tested when installed, within 72 hours of any repair or service, and at least once a year, by a certified Cross Connection Control Specialist. Peel Region also requires yearly testing. We install devices under permit and coordinate the tests.

What affects the cost of installing an interceptor?

Size and location. A small under-sink unit is a short plumbing job, while a large in-ground interceptor means cutting a slab or excavating outside, then restoring concrete or paving. Depth of the sewer connection, soil conditions and the permit add to it. Our engineers size the unit to your fixtures and flows, so you are not paying for more interceptor than you need.

Can a restaurant stay open while an interceptor is installed?

Often, yes. Small under-sink or in-floor units can be installed overnight or on a closed day. A larger in-ground interceptor means cutting the floor or excavating outside, which takes longer and may need a short closure of the kitchen. We plan the cut-in and plumbing tie-in so the kitchen is down for the shortest time the work allows.

When does a site need an engineered drainage or sewage design?

Usually when you add a connection, change flows, or build something the Building Code’s standard details do not cover, such as an on-site sewage system, storm drainage for a parking area or a large interceptor. Municipal rules also keep storm and sanitary flows apart, and in Toronto storm drainage may not be directed to a sanitary sewer. Our engineers prepare the design and permit drawings.

G-009 Free estimate

Get a free estimate.
Claim up to $2,500 in savings.

Fill out the form to claim up to $2,500 in savings on your next project. Tell us what you’re planning and we’ll book a visit to see the space. Offer terms

  1. 1Tell us about the project (about a minute)
  2. 2We typically reply within 24 hours to book your visit
  3. 3We review your space and goals and give you a clear estimate at no cost
Head office135 Ormont Drive, Unit 11C, North York, ON M9L 1N6

What can we help you with?
(647) 637-6052Free estimate

Your project sheet

One estimate, one site visit and one contract for everything on this list.

    Typical order of work

      Get one estimate