Honest & reliable contractors · Since 2018

A-202 Exterior Renovation

Composite and wood decks with the engineering done in-house

Decks in TimberTech, Trex, TIVADEK or stained wood, with the structure and guards worked out by our in-house engineers and the permit handled before construction starts.

  • In-house engineering for decks
  • TimberTech, Trex and TIVADEK
  • Benjamin Moore exterior stains

Free, no-obligation estimate. We typically reply within 24 hours.

An elevated composite deck with a glass railing, on posts set on concrete footings
Deck framing in progress: pressure-treated joists in metal hangers on a beam over concrete pier footings
A cedar deck with a rich semi-transparent stain, wood railing and built-in bench, backyard trees
Since 2018Honest & reliable contractors
In-house engineeringDrawings, letters & permits
The MKC GuaranteeOn time, within budget
162+ projectsAcross Toronto & the GTA

A-202.1 Why MKC

Why choose MKC for decks

A deck carries people, furniture and snow, so the work that counts is the part you never see. That means footings below the frost line, beams and joists sized for the span, and guards that meet the Ontario Building Code. Our engineering department works out the structure and prepares the permit drawings, and the same company builds it. Then you choose the surface: composite from TimberTech, Trex or TIVADEK, or pressure-treated or cedar with Benjamin Moore Arborcoat stain.

Featured

Glass railings, engineered in-house

Glass guards must carry the same loads the Ontario Building Code sets for any guard. Our engineers specify the glass, posts or base shoe and anchors, and because it’s custom glass work, your railing comes with a free engineering letter for the permit file.

Signature styles: Simple Retreat · Double Decker · Sleight Yum · Lines & Squares

A-202.2 Scope

What’s included

  • A-202.1Composite deckingTimberTech, Trex and TIVADEK boards, framed to each maker’s joist spacing.
  • A-202.2Wood decksPressure-treated or cedar, finished with Benjamin Moore Arborcoat stain.
  • A-202.3Glass railingsPost-mounted or base shoe glass, with engineering documentation included.
  • A-202.4Multi-level decksUpper decks, stairs and landings tied into one structure.
  • A-202.5Footings & framingFootings below the frost line and beams sized for the span.
  • A-202.6Permits & drawingsDrawings, engineering and the permit application, prepared in-house.

A-202.3 Budget & schedule

What affects
the price

Every estimate is built from your measurements and choices. These are the things that move the number most.

Typical timeline

On-site work for a typical deck is measured in days to a few weeks, depending on size, levels and railing type. The permit, when you need one, comes first, and some composite colours or custom glass can add lead time.

Every project is different, so your estimate comes with its own written schedule, and we aim to beat the usual industry timeline on every job.

  1. 01
    Height above ground

    Higher decks need taller posts, bracing and guards, and in Toronto any deck over 60 cm above ground needs a permit.

  2. 02
    Decking material

    Composite boards cost more upfront than pressure-treated wood, but they don’t need staining.

  3. 03
    Railing type

    Glass, aluminum and wood railings differ in price per linear foot, and glass adds engineering and hardware.

  4. 04
    Size & shape

    Square footage, levels, stairs, angles and picture-frame borders all add framing and cutting time.

  5. 05
    Existing structure

    Tearing out an old deck, or reusing a sound frame spaced for the new boards, changes the scope.

Our trusted composite suppliers

TimberTechTrexTIVADEK

Tap a logo to browse the catalogue.

Wood stain

Tap a logo to browse the catalogue.

G-003 How we work

How we deliver your deck

  1. 1

    Free Estimate

    Tell us what you have in mind. We review your space and goals and give you a clear estimate at no cost.

  2. 2

    Planning + Permits

    We finalize design and scope. Our in-house engineering team prepares drawings, engineering letters and permit applications.

  3. 3

    Material Procurement

    We order from trusted suppliers such as Unilock, Techo-Bloc, Permacon, TimberTech, Trex and Benjamin Moore, and schedule deliveries around the work.

  4. 4

    Construction Process

    Our crews build to code with site supervision and regular updates, so you always know where things stand.

  5. 5

    Project Completion

    Final inspection, walkthrough and clean-up. On time, within budget and beyond expectations. That is the MKC Guarantee.

Plan your project
with a free estimate.

We review your space and goals and give you a clear estimate at no cost.

A-202.4 Questions

Questions about decks

Don’t see your question? Call (647) 637-6052 or ask in your estimate request.

Do I need a permit for my deck?

That depends on where you live. In Toronto, a deck needs a building permit when any part is more than 60 cm above the ground, it has a roof, or it serves a required exit. Bradford West Gwillimbury also requires one for decks attached to the house or larger than 10 m², whatever the height. Zoning rules apply either way. We confirm which rules apply to your address, then prepare the drawings and file the permit application ourselves.

How high does the railing have to be?

Under the Ontario Building Code, a deck 600 mm (24 in.) or more above the ground needs a guard. On a house deck, the guard must be at least 900 mm (35 in.) high up to about 1.8 m above the ground, and 1 070 mm (42 in.) above that. Openings can’t exceed 100 mm (4 in.), and nothing between 100 mm and 900 mm up can make it easy to climb. We design every railing to those numbers.

Can you put composite boards on our existing deck frame?

Sometimes. TimberTech, for example, calls for joists no more than 16 inches apart on centre for residential decks, and 12 inches when the boards run diagonally, and many older wood frames are spaced wider. We open up the deck, check the joists, beams and footings for rot and spacing, and tell you whether the frame can carry composite or should be rebuilt.

Composite or wood: what’s the real difference?

Upfront cost and upkeep. Pressure-treated wood costs less to build and takes stain well, but it needs periodic cleaning and restaining to hold its colour. Composite from TimberTech, Trex or TIVADEK costs more at the start and needs only washing. Cedar is another option if you want natural wood. Ask us to quote both and we’ll show you the difference line by line.

Can we finance a new deck?

Yes, on eligible projects through Financeit. Financeit sets the approval, rates and terms, and you can apply once you have our estimate. Financing lets you build the full design now, glass railings and stairs included, instead of splitting the work over two seasons. We can walk you through the application when we review the quote with you.

G-009 Free estimate

Get a free estimate.
Claim up to $2,500 in savings.

Fill out the form to claim up to $2,500 in savings on your next project. Tell us what you’re planning and we’ll book a visit to see the space. Offer terms

  1. 1Tell us about the project (about a minute)
  2. 2We typically reply within 24 hours to book your visit
  3. 3We review your space and goals and give you a clear estimate at no cost
Head office135 Ormont Drive, Unit 11C, North York, ON M9L 1N6

What can we help you with?
(647) 637-6052Free estimate

Your project sheet

One estimate, one site visit and one contract for everything on this list.

    Typical order of work

      Get one estimate