A-503 Additions & New Builds

A legal basement apartment, permitted and inspected

A legal basement apartment is a second unit built with a permit and inspected. In Toronto a full conversion typically costs $90,000 to $150,000, before any underpinning.

Typical cost
$90,000–$150,000
Timeline
10–16 weeks on site
Permit
Yes, second-unit permit
Prices checked
2026
See the full cost guide
  • Permit drawings prepared in-house
  • Engineering for underpinning
  • Free on-site estimate

Free, no-obligation estimate. We typically reply within 24 hours.

A finished legal basement apartment with an egress window, a compact kitchen and a self-closing entrance door
Fire-rated drywall going up on a basement ceiling, with insulation between the joists above
A new excavated side entrance to a basement apartment, with concrete steps, a handrail, retaining walls, a guard and a canopy
Since 2018162+ projects across the GTA
$5 million liability insuranceWSIB clearance on request
Written warranty2 to 5 years on workmanship
In-house design & engineering3D models, drawings & permits

A-503.1 Why MKC

Why choose MKC for legal basement apartment

A basement suite is legal when it has a building permit for a second unit and passes inspection for ceiling height, fire separation, exits, alarms, plumbing and electrical. That is what lets you insure it, refinance on it and rent it legally. Our in-house engineering department measures the basement, prepares the drawings and files the permit, then we build it. We only use ECRA/ESA-licensed electrical contractors to perform any electrical work.

Featured

We measure before we price

Ceiling height decides more than anything else. The Ontario Building Code asks for 1.95 m in a secondary suite, or 1.85 m under beams and ducts. We measure every room, beam and duct run first. If the height is there, the budget is a conversion. If not, it includes lowering the floor.

A-503.2 Scope

What’s included

  • A-503.1Second-unit building permitAs-built and proposed drawings, the application and City inspections to final sign-off.
  • A-503.2Fire separationRated ceiling and walls between the units, self-closing doors and sealed openings.
  • A-503.3Exits and egress windowsA side entrance or excavated walkout, and bedroom windows large enough to escape through.
  • A-503.4Kitchen and bathroomA kitchen or kitchenette and a bathroom, with drains by a City-licensed plumbing contractor.
  • A-503.5Alarms and electricalInterconnected smoke and carbon monoxide alarms, new circuits and an ESA inspection.
  • A-503.6UnderpinningEngineered lowering of the floor where the ceiling is under the legal height.

A-503.3 Cost guide

What it costs
in Toronto & the GTA

Published 2026 prices for turning a Toronto or GTA basement into a legal, self-contained second unit.

Typical range$90,000–$150,000

Unfinished basement to a legal one-bedroom suite with permits; no underpinning

Typical timeline

Drawings come first. Toronto reviews complete permit applications for houses with up to two units within 10 business days, and a conversion to two units qualifies for its Express Services, which aims for 3 business days. Construction usually takes 10 to 16 weeks. Published guides allow four to six months from application to move-in, and six to nine months when the floor is lowered.

Every project is different, so your estimate comes with its own written schedule, and we aim to beat the usual industry timeline on every job.

Cost schedule · 2026
Level of workTypical cost
Legalizing a finished basementAdded cost over a standard finish: fire separation, egress, alarms, electrical and ventilation upgrades.$10,000–$20,000
Straightforward conversionThe lowest published GTA range: good height, simple layout and a modest kitchen. Treat it as a floor.$50,000–$80,000
Full conversionUnfinished basement to a one-bedroom suite: finishing, kitchen, bathroom, entrance, fire separation, permits.$90,000–$150,000
Conversion with underpinningThe full conversion plus lowering the floor to reach legal ceiling height. Deep or long walls cost more.$120,000–$220,000
Unit prices
ItemTypical price
Standard basement finish$65–$100per sq ft
Egress window with window well$3,000–$6,000per window
Separate side entrance$5,000–$12,000per entrance
Excavated walkout with retaining walls$12,000–$25,000per walkout
Underpinning to gain ceiling height$30,000–$80,000per project

Worked examples

  • Example 1

    Toronto house, 700 sq ft unfinished basement to a one-bedroom suite, bathroom rough-in in place

    $90,000–$150,000
  • Example 2

    Mississauga finished basement: side entrance, fire separation, two egress windows, electrical

    $18,000–$38,000
  • Example 3

    Older Toronto semi with a low ceiling: full conversion plus underpinning

    $120,000–$220,000

What moves the number

  1. 01
    Ceiling height

    If the basement is too low, underpinning adds $30,000 to $80,000 or more, plus engineering. It is the largest single swing in the budget.

  2. 02
    The way in and out

    A side-door entrance is published at $5,000 to $12,000. An excavated walkout with retaining walls and a drain runs $12,000 to $25,000.

  3. 03
    Kitchen and bathroom

    A bathroom runs $15,000 to $25,000 with a rough-in and $25,000 to $35,000 without. A full suite kitchen is published at $35,000 to $55,000.

  4. 04
    Fire and life safety

    Rated ceilings, self-closing doors and alarms run $3,000 to $6,000 per suite, and each egress window with its well $3,000 to $6,000.

  5. 05
    Power, heat and water

    A panel upgrade costs $2,000 to $5,000. Older basements may also need waterproofing or drain work before any finishes go in.

Rebates, subsidies and tax credits

  • Up to $7,500Multigenerational Home Renovation Tax Credit

    A refundable federal credit of 15% of up to $50,000 in costs. The work must create a self-contained unit so a senior, or an adult eligible for the disability tax credit, can live with a relative. Your own labour does not count. Keep invoices.

    Program rules
  • Up to 90% of improved valueCMHC Refinance for secondary suites

    An insured refinance through a CMHC-approved lender, on an as-improved value below $2 million, over up to 30 years. You or a close relative must live in one unit, the suite must be self-contained, and it cannot be a short-term rental.

    Program rules
  • No development chargesToronto development charge exemption

    The City charges no development charges on the second to sixth unit in a building of up to six units, in effect since July 24, 2025. The owner has to show the City that the project qualifies.

    Program rules

Ranges include finishing, kitchen, bathroom, fire separation, egress, drawings and permits, before HST. Waterproofing, a panel upgrade and a 10% to 15% contingency are extra where needed. Prices checked in 2026. Not a quote: your estimate is built from your own measurements and choices.

Where these numbers come from

G-003 How we work

How we deliver your basement apartment

  1. 1

    Free Estimate

    Tell us what you have in mind. We review your space and goals and give you a clear estimate at no cost.

  2. 2

    Design + Permits

    Our in-house designers model your project in 3D so you can see it and settle every choice. Our in-house engineering team prepares drawings, engineering letters and permit applications.

  3. 3

    Material Procurement

    We order cabinets, tile, stone, pavers and decking from trusted suppliers such as Unilock, Techo-Bloc, TimberTech and Trex, and schedule deliveries around the work.

  4. 4

    Construction Process

    Our crews build to code with site supervision and regular updates, so you always know where things stand.

  5. 5

    Project Completion

    Final inspection, walkthrough and clean-up. On time, within budget and beyond expectations. That is the MKC Guarantee.

Plan your project
with a free estimate.

We review your space and goals and give you a clear estimate at no cost.

A-503.4 Questions

Questions about legal basement apartment

Don’t see your question? Call (647) 637-6052 or ask in your estimate request.

How much does a legal basement apartment cost in Toronto?

Typical cost in Toronto and the GTA: $90,000 to $150,000 (Unfinished basement to a legal one-bedroom suite with permits; no underpinning). By level of work: Legalizing a finished basement: $10,000 to $20,000; Straightforward conversion: $50,000 to $80,000; Full conversion: $90,000 to $150,000; Conversion with underpinning: $120,000 to $220,000. Ceiling height moves the price most, because a low basement needs underpinning. After that it is the entrance, the kitchen and bathroom, and whether the basement is already finished. These are typical ranges, before HST, with prices checked in 2026; your estimate is built from your own measurements and choices.

What makes a basement apartment legal in Toronto?

A building permit and a passed final inspection. The City’s secondary suite permit covers an interior alteration that adds a second unit, smaller than the main one, in a detached house, semi or townhouse. The drawings show ceiling heights, exits, fire separation, alarms and plumbing, and the application includes a zoning summary and the City’s Rental Renovation Licence screening form. Electrical work is permitted and inspected separately through the ESA.

How high does the ceiling have to be?

Under the Ontario Building Code, a secondary suite needs ceilings of at least 1.95 m, or 1.85 m under beams and ducts. Many older Toronto basements fall short. Sometimes rerouting ducts or reframing a bulkhead is enough. If the slab itself is too high, the floor has to be lowered by underpinning or benching, which needs engineering and its own permit fee.

Does the suite need its own entrance?

It needs a safe way out that the Building Code accepts, and most suites get their own exterior door. A side door at grade with a few steps down is the least costly. Where there is no side access, we excavate a walkout with retaining walls, a drain and a landing. Bedrooms without a door to the outside need an egress window with a clear opening of at least 0.35 m² and no dimension under 380 mm.

My basement is already finished. Can it be legalized?

Usually, yes. We draw what is there, compare it with the Code and apply for the permit. Expect some finishes to be opened: ceilings often come down so rated drywall, typically 15.9 mm Type X, can go up, and alarms get interconnected between the units. Published guides put the added cost at $10,000 to $20,000 over a standard finish, and more where an entrance or egress windows are missing.

Is the federal secondary suite loan available?

No. The Canada Secondary Suite Loan Program announced in 2024 has not opened to applicants. Two programs that are open may apply. CMHC-insured refinancing for secondary suites allows up to 90 per cent of the improved value through approved lenders. The Multigenerational Home Renovation Tax Credit is worth up to $7,500 when the suite lets a senior, or an adult eligible for the disability tax credit, live with a relative.

What rent can a legal basement suite earn?

Published estimates disagree widely, from about $1,200 to $3,500 a month for the GTA, and none is appraisal or CMHC survey data. Rent depends on the street, the size, the ceiling height and the light. Ask a local agent for recent leases nearby before you rely on a number. We price the construction; we do not forecast rent.

Can I see my basement apartment in 3D before work starts?

Yes. We model the suite in 3D with its rooms, kitchen, bathroom and egress windows, so you can see how the unit works and approve the layout before construction starts.

G-009 Free estimate

Get a free estimate.
Claim up to $2,500 in savings.

Fill out the form to claim up to $2,500 in savings on your next project. Tell us what you’re planning and we’ll book a visit to see the space. Offer terms

  1. 1Tell us about the project (about a minute)
  2. 2We typically reply within 24 hours to book your visit
  3. 3We review your space and goals and give you a clear estimate at no cost
Head office135 Ormont Drive, Unit 11C, North York, ON M9L 1N6

What can we help you with?
(647) 637-6052Free estimate

Your project sheet

One estimate, one site visit and one contract for everything on this list.

    Typical order of work

      Get one estimate